عربي

National Petroleum Construction Company (NPCC)

The NATIONAL PETROLEUM CONSTRUCTION COMPANY (NPCC), a Public Joint Stock company, was established in April 1973. The fabrication facilities then were located on Sadiyat Island, 3 km east of Abu Dhabi city. The present facilities are now located at Mussafah, 35 km from Abu Dhabi city.

 

Growth of NPCC

In 1973, NPCC was initially established to provide a facility for the fabrication of steel structures required by the onshore and offshore Oil and Gas production industry. In 1978 NPCC expanded its operation by setting up a custom built pipe coating facility at the yard.

In 1979, NPCC ventured into offshore activities for the Oil & Gas industry, providing marine spreads for Pipelay, Installation and Hook-up works. Today, NPCC owns a dedicated marine fleet consisting 13 construction barges, capable of transportation of up to 12,000 tons, lifting single structures weighing up to 2,600 tons, laying submarine pipelines up to 60" in diameter and hook-up and maintenance works. In 1986, with the intention of serving onshore projects, NPCC ventured into manufacturing Storage Tanks & Spheres for storing various types of petroleum products such as; liquid sulphur, water, diesel oil, crude oil, liquefied natural gas (LNG), liquefied petroleum gas (LPG), etc. The dynamic growth of NPCC since its inception and its achievements over the years, have placed this National Company in a league with major international EPC contractors involved in the development of the Oil and Gas Industry.

In 1992, NPCC expanded its engineering capability for designing onshore & offshore facilities, loading terminals, storage tanks, pressure vessels and pipelines. Presently, NPCC has over 300 dedicated engineering staff to support the ongoing operations. The design team is fully equipped with latest state-of-the-art computers/softwares to meet engineering challenges.

In 1994, NPCC constructed its new modern facilities at Mussafah, 35 Km away from Abu Dhabi City, over an area of more than a million square meters.The facilities include modern fabrication & pipe coating yards, marine base and load out facility, offices and accommodation buildings. The fabrication yard is capable for fabrication of up to 67,000 tons of steel per year.

In 1996, a modern fabrication facility for fabrication of Pressure Vessels was added which is capable of manufacturing 6,000 tons/annum Pressure Vessels of various types in thickness up to 160 millimeter by hot rolling and 100 millimeter by cold rolling, in diameter from 600 millimeter to 6000 millimeter. The products manufactured at this facility are; Pressure Vessels, Slug Catchers, Separators, Columns, Towers, Scrubbers and other related equipment covering Carbon Steel and Stainless Steel Material. The new state-of-the-art Pressure Vessels Manufacturing Facilities are accredited by ASME to use "U", "U2", "S" and "R" Stamps.

Today, NPCC, as an established global construction company, provides Clients total Engineering, Procurement and Construction (EPC) services in the development of offshore and onshore Oil and Gas fields for the Arabian Gulf and the regional markets.

 

Out Vision

"We endeavor to be a leading EPC Organization in the Energy Sector"

Our Aspirations and all Strategic Objectives are directed toward achieving the same as a beam of light piercing the Sky. We expect everyone to embed it in his/her own capacity.

 

Our Mission

  • Identify the needs for our services in our chosen region and strive, both singly and in participation with venture partners, to fulfill the requirements to the full satisfaction of our clients, business partners and shareholders.
  • Expand and diversify our offshore and onshore capabilities
  • Extend the area of onshore operation beyond UAE to cover the Gulf region
  • Maintain commitment to our HSE Policy at all levels of the company , demanding similar standards from its vendors, subcontractors and business partners.
  • Strive for operational excellence in both the management and execution of projects by diligently importing best practices, maintaining international standards in the quality of work and improving productivity
  • Sustained commitment to growth is firmly linked to our commitment towards our employees' development and rewarding careers
  • Continue to provide employment and training to UAE Nationals, focusing on their career development
  • To be pro-active socially, maintain a friendly attitude and provide necessary service to the community wherever we operate.

 

Contact Details

National Petroleum Construction Co.

Tel: +971 2 554 9000  |  Fax: +971 2 554 9111

P.O.Box: 2058 | Abu Dhabi, UAE

Email: npccnet@eim.ae  |  Website: www.npcc.ae

View by : عربي / English
Home | Company Profile | GHC Companies | Board of Directors | Careers | Contact Us | GHC News © General Holding Corporation 2011